Resource

Industrial Coating Bid and Scope Checklist

Information owners and contractors should collect before requesting coating or blasting pricing.

Industrial Coating Bid and Scope Checklist representative capability

Scope & Fit

Built Around the Asset, Environment and Specification

Each project is reviewed around asset condition, service exposure, access, schedule and the owner or engineer specification. Shop and field options are compared when appropriate.

Common project needs

  • Asset list and dimensions
  • Photos and existing condition
  • Coating specification and color
  • Location, access and schedule
Planning

What We Evaluate Before Work Begins

01

Existing Condition

Substrate, corrosion, contamination and coating failure guide the preparation plan.

02

Exposure

Salt, moisture, chemicals, heat, abrasion and immersion affect system selection.

03

Specification

Required profile, cleanliness, dry-film thickness and inspection hold points are reviewed.

04

Execution

Shop versus field work, access, containment, transport and schedule are coordinated.

Selection considerations

  • Define inclusions and exclusions
  • Identify inspection responsibility
  • Clarify containment and disposal
  • List alternates separately
Frequently Asked Questions

Questions About Coating Bid Checklist

What information should we send?

Provide the asset list, dimensions, location, photographs, existing condition, specification and schedule.

Can the work be completed in your shop?

Transportable assets can be evaluated for shop work based on dimensions, handling, route and booth fit.

Do you follow owner specifications?

Yes. Materials, preparation, application and documentation are planned around the approved project requirements.

Protect the Asset. Plan the Work. Get It Back in Service.

Share the asset, service environment, existing condition, specification and schedule.